Today's a public holiday, Labour Day. I've been spreading myself pretty thin between family, household chores and making progress on the kayak. However, I got the second fill sanded back and added the final details to the cockpit before painting.
The first fill used nine pump's worth of epoxy, the second fill used three, and the last fill applied today used only one and there was heaps left over. I know the finish still won't be perfect, but its as good as I'm prepared to do for the inside of a closed cockpit kayak. It should take less than half-an-hour to sand out tomorrow, so I can wash down and get some primer on.
I also primed the seat panel on one side with plain epoxy. I popped the washers out and sanded them with some 240 grit and then forced them back into the recessed holes with the resin in the hope that they bond in place.
I also cut and bonded in the cockpit stringers, as well as priming them on three faces, leaving the top bare ready to bond to the deck. Behind the aft deck beam I added a couple of blocks, one cut to a curve to fit snugly under the deck, the other a small knee style brace between it and the deck beam. The purpose of these pieces is to reinforce the area immediately behind the cockpit so I can bolt an eye through there to mount a tow line.
Sunday, October 26, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment